Outside view of the shelter. Outside kennels runs will be attached to the slab.


This door was just hung and the Water Heater is being prepared for installation.

Trying out the lights in the kennel area.
We couldn't wait.

Getting ready for inspection.

Cleaning the drainage collector to test the system.

Inspector dogs observe the drain cleaning as they prepare to do thier part for the test.



One of the dogs trying out the kennel for size.


"Woody" keeping an eye of the trim crew's work.

Our new Front Desk in the Reception area.

Kennel trim installation crew.

Our new 3 compartment sink that will be installed here in the feed room.

One of our inspectors determines if the sun angle is correct.